PermalinkGallery

TAMU West Campus Training & Dressing Room Facility

TAMU West Campus Training & Dressing Room Facility

Project Owner: Texas A&M University
Architect: VLK Architects
Contract Amount: $4,545,770
Completion Date: January 2003
Contact Name: Bobby […]

PermalinkGallery

City of Bryan University Ranch Contract 6

City of Bryan University Ranch Contract 6

Project Owner: Bond Take-Over Project for the City of Bryan
Architect: Mitchell and Morgan
Contract Amount: […]

Kent Moore Cabinets Phase 2

,

Project Owner: Kent Moore Cabinets
Architect: Ben Boettcher Architects
Contract Amount: $4,250,000
Completion Date: November 2008
Contact Name: Jack Marino
Contact Number: (979) 779-2906

PermalinkGallery

Bryan ISD Sam Rayburn Renovations

Bryan ISD Sam Rayburn Renovations

Project Owner: Bryan Independent School District
Architect: R.L. Payne and Associates
Contract Amount: $2,590,000
Completion Date: August […]

Brazos County Expo Center

,

Project Owner: Brazos County
Architect: Jim Singleton Architects
Contract Amount: $2,565,306
Completion Date: July 2007
Contact Name: Corbyn […]

Kent Moore Cabinets

,

Project Owner: Kent Moore Cabinets
Architect: Ben Boettcher
Contract Amount: $2,515,016
Completion Date: August 2004
Contact Name: Jack Marino
Contact Number: (979) 695-2432

PermalinkGallery

City of College Station Tauber & Stasney St. Rehab

,

City of College Station Tauber & Stasney St. Rehab

,

Project Owner: City of College Station
Architect: McClure and Browne
Contract Amount: $2,508,000
Completion Date: March 2012
Contact Name: Ed McDonald
Contact Number: (979) 764-3528

PermalinkGallery

Somerville ISD Campus Improvements

Somerville ISD Campus Improvements

Project Owner: Somerville Independent School District
Architect: Patterson and Associates
Contract Amount: $2,507,905
Completion Date: December 2004
Contact […]

PermalinkGallery

Burleson County St. Joseph Medical Clinic

Burleson County St. Joseph Medical Clinic

Project Owner: Burleson County Hospital District
Architect: R.L. Payne and Associates
Contract Amount: $2,133,000
Completion Date: January 2009
Contact Name

O.I. Analytical, Inc

,

Project Owner: O.I. Analytical, Inc.
Architect: O.I. Analytical, Inc.
Contract Amount: $2,039,380
Completion Date: July 1999
Contact Name: […]

Global Genetics and Biological Lab

,

Project Owner: Global Genetics and Biological Lab
Architect: Keese and Associates
Contract Amount: $1,667,265
Completion Date: August […]

PermalinkGallery

Texas A&M Easterwood Airport Fire Fighting Facility

,

Texas A&M Easterwood Airport Fire Fighting Facility

,

Project Owner: Texas A&M University
Architect: Carter Design Associates
Contract Amount: $1,605,678
Completion Date: January 1999
Contact Name: […]

A&M Super Storage

Project Owner: Hubbard Kennady III
Architect: Patterson and Associates
Contract Amount: $1,532,410
Completion Date: May 2008
Contact Name: Hubbard Kennady III
Contact Number: (979) 255-2057

City of Bryan Crescent Pointe Parkway

,

Project Owner: City of College Station
Architect: Pledger/Kalkomey
Contract Amount: $1,404,005
Completion Date: December 2005
Contact Name: John […]

PermalinkGallery

TAMU Olsen Field and Softball Field Renovations

,

TAMU Olsen Field and Softball Field Renovations

,

Project Owner: Texas A&M University
Architect: O’Malley Engineers
Contract Amount: $1,390,000
Completion Date: October 2005
Contact Name: Bobby […]

PermalinkGallery

Bryan ISD Branch Elementary School Renovations

Bryan ISD Branch Elementary School Renovations

Project Owner: Bryan Independent School District
Architect: R.L. Payne and Associates
Contract Amount: $1,321,000
Completion Date: August […]

City of Bryan Park Hudson Trails

, , ,

Project Owner: City of Bryan
Architect: McClure and Browne
Contract Amount: $1,272,000
Completion Date: May 2009
Contact Name: […]

Hearne ISD Elementary School

,

Project Owner: Hearne ISD
Architect: Jim Singleton Architects
Contract Amount: $1,045,000
Completion Date: July 2007
Contact Name: David […]

City of College Station Fire Station #2

, ,

Project Owner: City of College Station
Architect: BRW Architects
Contract Amount: $1,003,410
Completion Date: November 2001
Contact Name: […]

PermalinkGallery

Texas A&M University Becky Gates Children’s Center

Texas A&M University Becky Gates Children’s Center

Project Owner: Texas A&M University
Architect: Patterson Architects
Contract Amount: $989,682
Completion Date: August 1998
Contact Name: Ronnie […]

PermalinkGallery

Central Baptist Church Interior Modifications

Central Baptist Church Interior Modifications

Project Owner: Central Baptist Church
Architect: The Arkitex Studio
Contract Amount: $961,000
Completion Date: December 2010
Contact Name: Chuck Bestor
Contact Number: (979) 776-9977

PermalinkGallery

Texas A&M University Easterwood Airport Fencing Improvements

Texas A&M University Easterwood Airport Fencing Improvements

Project Owner: Texas A&M University
Architect: Freese amd Nichols
Contract Amount: $958,000
Completion Date: December 2006
Contact Name: […]

Sam Houston State University Bearkat Camp

, , ,

Project Owner: Sam Houston State University
Architect: Land Design Studio
Contract Amount: $906,635
Completion Date: November 2007
Contact […]

PermalinkGallery

Grimes Co. St. Joseph ER Renovations

Grimes Co. St. Joseph ER Renovations

Project Owner: St. Joseph Hospital
Architect: Cumpton and Associates
Contract Amount: $881,000
Completion Date: May 2009
Contact Name: Steve Crichon
Contact Number: (979) 775-2561

PermalinkGallery

Sam Houston State University Workshop in Art and Studio History Facility

,

Sam Houston State University Workshop in Art and Studio History Facility

,

Project Owner: Sam Houston State University
Architect: Perspectiva
Contract Amount: $848,000
Completion Date: May 2010
Contact Name: John McCroskey
Contact […]

PermalinkGallery

Sam Houston State University Hotel Renovations

Sam Houston State University Hotel Renovations

Project Owner: Sam Houston State University
Architect: Perspectiva
Contract Amount: $835,000
Completion Date: August 2010
Contact Name: John McCroskey
Contact […]

PermalinkGallery

Huntsville ISD High School Cosmetology Addition

Huntsville ISD High School Cosmetology Addition

Project Owner: Huntsville Independent School District
Architect: Joiner Partnership, Inc.
Contract Amount: $716,000
Completion Date: July 2006
Contact […]

PermalinkGallery

Kohl’s Box Culvert and Utility Relocation

Kohl’s Box Culvert and Utility Relocation

Project Owner: New Plan Excel Realty Trust
Architect: Mitchell and Morgan LLP
Contract Amount: $713,525
Completion Date: June 2007|
Contact Name: Veronica Morgan
Contact […]

PermalinkGallery

Chi Omega House Addition and Renovations

Chi Omega House Addition and Renovations

Project Owner: Chi Omega
Architect: The Arkitex Studio
Contract Amount: $686,000
Completion Date: August 2010
Contact Number: (979) 693-5340

Dynacon Facility

Project Owner: Dynacon
Architect: Holster and Associates
Contract Amount: $661,557
Completion Date: May 1999
Contact Name: Jim Holster
Contact […]

PermalinkGallery

Texas A&M University Rudder Theater ADA Upgrades

Texas A&M University Rudder Theater ADA Upgrades

Project Owner: Texas A&M University
Architect: Chesney Morales and Associates
Contract Amount: $658,000
Completion Date: January 2012
Contact […]

PermalinkGallery

Texas A&M University Soccer Field Renovation

Texas A&M University Soccer Field Renovation

Project Owner: Texas A&M University
Architect: Texas A&M University
Contract Amount: $657,000
Completion Date: May 2004
Contact Name: Bobby McDonald
Contact Number: (979) […]

PermalinkGallery

Texas A&M University White Creek Bridge

,

Texas A&M University White Creek Bridge

,

Project Owner: Texas A&M University
Architect: Goodwin/Lasiter
Contract Amount: $637,000
Completion Date: May 2008
Contact Name: Phil SanAngelo
Contact […]

PermalinkGallery

TMPA Jack Creek Site Work and Development

TMPA Jack Creek Site Work and Development

Project Owner: TMPA
Engineer: Burns and McDonnell
Contract Amount: $590,076
Completion Date: August 2007

Madisonville Volunteer Fire Station

, ,

Project Owner: Madisonville Volunteer Fire Department
Architect: Cumpton and Associates
Contract Amount: $563,540
Completion Date: September 2001
Contact […]

PermalinkGallery

Texas A&M University George Bush Library Annenberg Presidential Conference Center

Texas A&M University George Bush Library Annenberg Presidential Conference Center

Project Owner: Texas A&M University
Architect: VLK Architects
Contract Amount: $556,482
Completion Date: May 2003
Contact Name: Steve […]

City of College Station Crompton Park

, ,

Project Owner: City of College Station
Architect: Patterson and Associates
Contract Amount: $546,809
Completion Date: October 2005
Contact […]

PermalinkGallery

Bryan ISD Johnson Elementary School Renovations

Bryan ISD Johnson Elementary School Renovations

Project Owner: Bryan Independent School District
Architect: BRW Architects
Contract Amount: $498,652
Completion Date: August 2005
Contact Name: […]

City of Giddings Simmang Park

,

Project Owner: City of Giddings
Architect: O’Malley
Contract Amount: $497,350
Completion Date: August 2004
Contact Name: Paul Kipp
Contact […]

PermalinkGallery

TDCJ – Vehicle Maintenance Addition – Wynne Unit

,

TDCJ – Vehicle Maintenance Addition – Wynne Unit

,

Project Owner: Texas Department of Criminal Justice
Architect: Texas Department of Criminal Justice
Contract Amount: $463,900
Completion […]

City of Brenham Airport T-Hangar Construction

, ,

Project Owner: City of Brenham
Architect: O’Malley Engineers
Contract Amount: $441,536
Completion Date: July 2007
Contact Name: Doug […]

PermalinkGallery

Sherwood Rehabilitation Center

Sherwood Rehabilitation Center

Project Owner: Sherwood Health Care
Architect: Bill Scarmardo
Contract Amount: $428,143
Completion Date: April 1998
Contact Number: (979) 776-7521

Del Sol Foods

Project Owner: Del Sol Foods
Architect: Keese and Associates
Contract Amount: $423,641
Completion Date: June 2002
Contact Number: (979) 836-5978

PermalinkGallery

Aguirre Family Care Clinic

Aguirre Family Care Clinic

Project Owner: Aguirre Family Clinic
Architect: Keese and Associates
Contract Amount: $416,000
Completion Date: June 2002
Contact Number: (903) 322

Lube King

,

Project Owner: Lube King
Architect: None
Contract Amount: $397,437
Completion Date: August 2000
Contact Name: Doug Williams
Contact Number: (979) 776-8200

PermalinkGallery

Bryan ISD Fuel Tank Canopy Replacement

Bryan ISD Fuel Tank Canopy Replacement

Project Owner: Bryan Independent School District
Architect: Goodwin-Lasiter
Contract Amount: $387,314
Completion Date: August 2007
Contact Name: Grady […]

PermalinkGallery

First National Bank Interior Remodel

First National Bank Interior Remodel

Project Owner: First National Bank
Architect: The Arkitex Studio
Contract Amount: $370,615
Completion Date: December 2001
Contact Name: Tim Bryan
Contact Number: (979) 779-1111

Toyo Ink Facility

,

Project Owner: Toyo Ink
Architect: KBD Group
Contract Amount: $358,000
Completion Date: September 2011
Contact Number: (979) 778-1538

PermalinkGallery

City of Palestine Willow Creek Bus. Park Baseline F

,

City of Palestine Willow Creek Bus. Park Baseline F

,

Project Owner: City of Palestine
Architect: ARCADIS
Contract Amount: $333,604
Completion Date: April 2006
Contact Name: Ron Sullivan
Contact Number: (903) 731-8455

PermalinkGallery

Madisonville ISD Concession and Restroom Improve.

Madisonville ISD Concession and Restroom Improve.

Project Owner: Madisonville Independent School District
Architect: Cumpton and Associates
Contract Amount: $308,000
Completion Date: February 2008
Contact Name: […]

PermalinkGallery

Chi-Omega House Renovations

Chi-Omega House Renovations

Project Owner: Chi Omega
Architect: Potter and Associates
Contract Amount: $306,546
Completion Date: August 2004
Contact Number: (979) 693-5340

The Greenery

Project Owner: The Greenery
Architect: None
Contract Amount: $281,300
Completion Date: September 2002
Contact Name: Len Gallagher
Contact Number: (979) 823-7551

PermalinkGallery

Prairie View A&M University Band Practice Field

Prairie View A&M University Band Practice Field

Project Owner: Prairie View A&M University
Architect: Marshall Engineering Corp.
Contract Amount: $265,231
Completion Date: January 2006
Contact […]

PermalinkGallery

Prairie View A&M University Pre-Med Academy

Prairie View A&M University Pre-Med Academy

Project Owner: Prairie View A&M University
Architect: IDG Architects, LLC
Contract Amount: $260,712
Completion Date: April 2005
Contact […]

City of College Station Oaks Park Pavilion

, ,

Project Owner: City of College Station
Architect: Patterson and Associates
Contract Amount: $260,532
Completion Date: May 2008
Contact […]

PermalinkGallery

City of Bryan Downtown Gateway Park

,

City of Bryan Downtown Gateway Park

,

Project Owner: City of Bryan
Architect: City of Bryan
Contract Amount: $246,000
Completion Date: June 2008
Contact Name: Susan Monnat
Contact Number: (979) 209-5030

PermalinkGallery

State Bank – Bryan Branch Remodel

State Bank – Bryan Branch Remodel

Project Owner: State Bank
Architect: Cutright and Allen, Inc.
Contract Amount: $245,000
Completion Date: April 2005
Contact Name: Sam Urso
Contact Number: (979) 779-2900

PermalinkGallery

Brazos Christian School Portable Building Prep

Brazos Christian School Portable Building Prep

Project Owner: Brazos Christian School
Architect: The Arkitex Studio
Contract Amount: $245,000
Completion Date: August 2010
Contact Name: Rob Armstrong
Contact Number: (979) 823-1000

PermalinkGallery

Texas A&M University Military Mall Arches

Texas A&M University Military Mall Arches

Project Owner: Texas A&M University
Architect: Texas A&M University Engineering and Design Department
Contract Amount: $240,238
Completion […]

PermalinkGallery

TDCJ Upgrades to Well at Buffalo Ranch

TDCJ Upgrades to Well at Buffalo Ranch

Project Owner: Texas Department of Criminal Justice
Architect: Texas Department of Criminal Justice
Contract Amount: $238,900
Completion […]

PermalinkGallery

Bryan ISD Henderson Elementary School Parking Lot

Bryan ISD Henderson Elementary School Parking Lot

Project Owner: Bryan Independent School District
Engineer: Goodwin-Lasiter
Contract Amount: $212,806
Completion Date: August 2011
Contact Name: Grady […]

PermalinkGallery

A&M United Methodist Church Slab Replacement

A&M United Methodist Church Slab Replacement

Project Owner: A&M United Methodist Church
Architect: Heimsath Architects
Contract Amount: $198,000
Completion Date: July 2007
Contact Name: Will McCollum
Contact Number: (979) 846-8731

PermalinkGallery

Bryan ISD SOS Campus Relocation

Bryan ISD SOS Campus Relocation

Project Owner: Bryan Independent School District
Architect: Patterson Architects
Contract Amount: $190,000
Completion Date: August 2008
Contact Name: […]

PermalinkGallery

Prairie View A&M Tractor Barn and Quonset Hut

Prairie View A&M Tractor Barn and Quonset Hut

Project Owner: Prairie View A&M University
Architect: IDG Architects, LLC
Contract Amount: $179,500
Completion Date: May 2006
Contact Name: Dianne Walker
Contact Number: (936) […]

PermalinkGallery

Texas A&M University Low Speed Wind Tunnel

Texas A&M University Low Speed Wind Tunnel

Project Owner: Texas Environmental Experiment Station
Architect: Holster and Associates
Contract Amount: $177,800
Completion Date: August 2005
Contact Name: Jim Holster
Contact Number: (979) […]

PermalinkGallery

Bryan ISD Crockett Elementary School Gymnasium Renovations

Bryan ISD Crockett Elementary School Gymnasium Renovations

Project Owner: Bryan Independent School District
Architect: Jim Singleton Architects
Contract Amount: $151,350
Completion Date: August 2005
Contact Name: […]

PermalinkGallery

Prairie View A&M University Creamery/Smoker Upgrades

Prairie View A&M University Creamery/Smoker Upgrades

Project Owner: Prairie View A&M University
Architect: Marshall Engineering Corp.
Contract Amount: $144,818
Completion Date: December 2007
Contact […]

PermalinkGallery

Brazos County Precinct 3 Volunteer Fire Department

,

Brazos County Precinct 3 Volunteer Fire Department

,

Project Owner: Brazos County Precinct 3
Contract Amount: $144,344
Completion Date: September 2004
Contact Name: Jerry Merker
Contact […]

Weather’s Lake

Project Owner: Gary Weathers
Architect: N/A
Contract Amount: $142,400
Completion Date: September 2012
Contact Name: Gary Weathers

PermalinkGallery

Texas A&M AgriLife Reseach Aquaculture Pond Renov

Texas A&M AgriLife Reseach Aquaculture Pond Renov

Project Owner: Texas A&M AgriLife Research
Contract Amount: $123,600
Completion Date: November 2010
Contact Name: Jimmy Dunn
Contact […]

PermalinkGallery

College Station ISD Pebble Creek Drainage Improv.

,

College Station ISD Pebble Creek Drainage Improv.

,

Project Owner: College Station ISD
Architect: College Station ISD
Contract Amount: $121,238
Completion Date: August 2007
Contact Number: […]

PermalinkGallery

College Station ISD Acoustical Ceiling Replacement

College Station ISD Acoustical Ceiling Replacement

Project Owner: College Station ISD
Architect: College Station ISD
Contract Amount: $107,400
Completion Date: August 2007
Contact Number: […]

City of Caldwell Park Gazebo

,

Project Owner: City of Caldwell
Architect: O’Malley
Contract Amount: $106,500
Completion Date: September 2003
Contact Name: Robert Schmidt
Contact […]

PermalinkGallery

Traditions Club Cart Storage Building

Traditions Club Cart Storage Building

Project Owner: Traditions Club
Architect: Traditions Club
Contract Amount: $94,485
Completion Date: February 2005
Contact Name: Eddie Hare
Contact […]

Quicker Sticker

Project Owner: Lori Williams
Architect: Dudley Construction
Contract Amount: $81,216
Completion Date: May 2001
Contact Name: Lori Williams
Contact Number: 693-8512

PermalinkGallery

Bryan ISD Viking Stadium Track Improvements

Bryan ISD Viking Stadium Track Improvements

Project Owner: Bryan Independent School District
Architect: SBWV Architects
Contract Amount: $69,463
Completion Date: March 2005
Contact Name: […]

PermalinkGallery

Bryan ISD Rudder HS Concession Building Pad

Bryan ISD Rudder HS Concession Building Pad

Project Owner: Bryan Independent School District
Architect: Goodwin-Lasiter
Contract Amount: $56,000
Completion Date: August 2009
Contact Name: Larry […]

PermalinkGallery

Texas A&M University Biological Sciences East Renovations

Texas A&M University Biological Sciences East Renovations

Project Owner: Texas A&M University
Architect: Patterson Architects
Contract Amount: $55,950
Completion Date: April 2007
Contact Name: Fred Patterson
Contact Number: (979) 775-6036

City of Bryan Bonham Park

, ,

Project Owner: City of Bryan
Architect: Holster and Associates
Contract Amount: $49,950
Completion Date: April 1999
Contact Name: […]

PermalinkGallery

Texas A&M University Creek Erosion

Texas A&M University Creek Erosion

Project Owner: Texas A&M University
Architect: Texas A&M University Engineering and Design Department
Contract Amount: $48,181
Completion […]

PermalinkGallery

City of College Station Tarrow Park Waterplay Park

,

City of College Station Tarrow Park Waterplay Park

,

Project Owner: City of College Station
Architect: City of College Station Parks and Rec Department
Contract […]

PermalinkGallery

City of College Station Thomas Park and Lemontree Park

,

City of College Station Thomas Park and Lemontree Park

,

Project Owner: City of College Station
Architect: City of College Station Parks and Rec
Contract Amount: […]

PermalinkGallery

City of College Station Brothers, Merry Oaks and Rain Tree Parks

,

City of College Station Brothers, Merry Oaks and Rain Tree Parks

,

Project Owner: City of College Station
Architect: City of College Station Parks and Rec
Contract Amount: […]

PermalinkGallery

City of College Station Sign at College Station Business Park

,

City of College Station Sign at College Station Business Park

,

Project Owner: City of College Station
Architect: City of College Station Parks and Rec
Contract Amount: […]

City of Caldwell Gabbard Park

,

Project Owner: City of College Station
Architect: City of College Station Parks and Rec
Contract Amount: […]

PermalinkGallery

City of College Station Central Park Softball Entrance Improvements

,

City of College Station Central Park Softball Entrance Improvements

,

Project Owner: City of College Station
Architect: City of College Station
Contract Amount: $31,400
Completion Date: April […]

PermalinkGallery

City of College Station Sandstone Park

,

City of College Station Sandstone Park

,

Project Owner: City of College Station
Architect: City of College Station Parks and Rec
Contract Amount: […]

Click Here To View A List Of All Completed Projects